114,894

Properties where the answer can be β€œNo” before the question is properly asked.

That’s what this investigation is trying to change. Not automatic approval. A fair pathway to ask the question.

Follow the investigation

New episodes, research findings and what actually moves.

An email when there's something worth telling you about. Unsubscribe any time.

A right to apply is not a right to build.

This isn’t an argument that every second home should be approved. Some land carries serious bushfire or flood risk. Some blocks can’t take
another wastewater system. Some sit on productive farmland or environmentally sensitive country. Those are real considerations and they
should decide the outcome.

But there’s a difference between a property failing a proper assessment and a family never getting one.

A safe no is planning working.Β 

A locked door before anyone asks the safety question is something else.

The series

Six episodes, from a family's kitchen table to the statewide planning framework. Episode 0 is live. The rest are in production.

What I'm actually asking for

Standardise the doorway. Localise the assessment.

Create a clear statewide pathway to apply for a secondary dwelling on appropriate rural and large-lot residential land. Then assess the genuine risks and the merits of the proposal properly, through the process that already exists.

That’s it. That’s the whole ask. It doesn’t mean automatic approval. It doesn’t mean houses on land that can’t safely carry them. It means the decision gets made on the evidence about the property, not on which rulebook happened to survive the last council amalgamation.

What still gets assessed

Everything that should be. Depending on the site and the proposal:

  • Bushfire risk
  • Flood risk
  • Wastewater and water supply
  • Vehicle and emergency access
  • Biodiversity and environmental impact
  • Heritage
  • Impact on productive agriculture and land-use conflict
  • Building standards and construction requirements
  • Servicing, infrastructure and road capacity
  • Amenity and neighbouring impact

Β 

An unsafe, unserviceable or genuinely conflicting proposal should still be changed, conditioned or refused. That’s what assessment is for. The
argument is that those questions should decide the answer, not a land-use
table written before anyone had heard of a housing crisis.

Who were you trying to create a home for?

An adult child. An ageing parent. Someone rebuilding after a separation. A worker you couldn’t house. Someone else entirely.

If you’ve run into thisβ€”the knockback, the pre-DA that went nowhere, the consultant’s invoice for finding out you couldn’t apply at allβ€”I want to hear about it. The later episodes in this series are built on real situations, not hypotheticals.

You can share it anonymously. Telling me doesn’t mean I’ll publish it.

How this research works

This project mixes official sources with our own analysis. They’re not the same thing and I’m not going to present them as if they are.

Official sources

Current legislation, local environmental plans, parliamentary material and government publications. Primary documents.

Commentary and opinion

My interpretation, my criticism and my reform proposals. Clearly mine, and arguable.

Time-sensitive claims are rechecked before publication. Permission to apply is kept separate from approval to build, every time.

Who's behind this

I’m Jesse Anyan. I work in land, alternative accommodation and early planning feasibility β€” that’s how I ended up here. I expected the rules to
be detailed. I didn’t expect the first fight to be whether a modest home could legally enter the process at all.

This project runs through Glamporise, which is my business. It’s a commercial operation and I’d rather say that plainly than have someone find it out and wonder what else I left off the page.

This project is general public-interest research, education and commentary.
It is not property-specific planning, legal, building, engineering, bushfire, flood, environmental, wastewater, financial or investment advice.

Planning outcomes depend on the specific land, its zoning, the planning instrument that applies, existing development, intended occupancy, the design of the proposal, mapped constraints and other property-specific circumstances.

Where a use is described as permitted with consent, that means an approval pathway may exist. It does not mean a particular proposal is suitable or
likely to be approved.

Before making financial commitments or relying on a possible development pathway, get advice from appropriately qualified professionals and confirm
the controls currently applying to the land.