What Is a Section 10.7 Planning Certificate? Your First Practical Step Before Any Glamping Decision
A Section 10.7 planning certificate is the first document every NSW glamping operator needs to order โ before buying land, engaging consultants, or spending a dollar. Here's what it tells you and how to read it.
By Jesse Anyan
Founder of Glamporise
TL;DR
A Section 10.7 planning certificate is your property’s official “spec sheet” โ issued by your local council, it shows your land’s zoning, which planning policies apply, and any known hazards like bushfire, flooding, or contamination. For glamping operators, it’s the first thing to check before you buy land, engage a planner, or order a single dome. You can order one from your council or the NSW Planning Portal. Anyone can request one โ you don’t need to own the property.
The Document You Should Have Ordered Before Anything Else
Here’s a scenario that plays out more often than it should.
Someone finds a beautiful rural property โ rolling hills, big sky, the right distance from a major city. They start sketching dome layouts. They talk to suppliers. They post about it on Instagram. Then, three months and a fair bit of money later, someone โ a consultant, a neighbour, a council officer โ tells them the land is zoned for environmental conservation. Visitor accommodation is prohibited. The dream is dead on arrival.
A Section 10.7 planning certificate would have told them this on day one. For under $100 and a few days’ wait.
That’s what this document is for. Before you think about tents, domes, marketing, or Instagram content โ know your land. A Section 10.7 certificate is how you do that.
More Posts

Bushfire Basics for NSW Glamping Sites: BAL Ratings, Fire Safety and What Council Actually Expects
30 JUNE 2026 Bushfire Basics for NSW Glamping Sites: BAL Ratings, Fire Safety and What Council Actually Expects Bushfire planning isn’t optional for NSW glamping

Water, Waste and Toilets: The Unglamorous Systems That Make or Break Your NSW Glamping Site
30 JUNE 2026 Water, Waste and Toilets: The Unglamorous Systems That Make or Break Your NSW Glamping Site No one books a glamping trip for

The Hidden Permits Most NSW Glamping Operators Miss: Section 68 Approvals Explained
30 JUNE 2026 The Hidden Permits Most NSW Glamping Operators Miss: Section 68 Approvals Explained You’ve got your DA sorted โ but did you know

STRA vs Tourist and Visitor Accommodation: What NSW’s Short-Stay Rules Actually Mean for Glamping
30 JUNE 2026 STRA vs Tourist and Visitor Accommodation: What NSW’s Short-Stay Rules Actually Mean for Glamping Think your glamping domes need to register as
Subscribe to our Newsletter:
What Is a Section 10.7 Planning Certificate?
Under Section 10.7 of the Environmental Planning and Assessment Act 1979, local councils are required to issue planning certificates when requested. The certificate summarises the planning rules and restrictions that apply to a specific parcel of land.
Think of it as the property’s logbook. It tells you what the land is, what you can and can’t do with it, and what risks or restrictions you need to know about before committing to anything.
For glamping operators, this is your first reality check. A spectacular view and a scenic paddock mean nothing if the zoning prohibits the use you’re planning.
There are two versions.
Section 10.7(2) โ The Standard Certificate
The 10.7(2) is the version most people need first. It covers four key areas.
Land Zoning
Whether the land is zoned rural (RU1, RU2, RU4), environmental, residential, or something else. Zoning determines whether tourist accommodation is permitted outright, permitted with development consent, or prohibited entirely. This one section can tell you immediately whether your glamping idea is viable on a given property.
Applicable Planning Instruments and Policies
This lists the State Environmental Planning Policies (SEPPs) and Local Environmental Plans (LEPs) that apply to your land. For glamping operators, the key ones to look for are:
- The Agritourism SEPP โ if you’re a farmer, this may enable exempt or complying development for farm stay accommodation
- The Housing SEPP โ relevant if STRA rules might apply to any residential dwelling on the same property
- The Codes SEPP โ governs exempt and complying development pathways
Planning Controls
Height limits, minimum lot sizes, setback requirements, heritage conservation areas, scenic protection overlays. These inform the scale and design of what you can build. A line that reads “minimum lot size 100 ha” quickly tells you that a 20-hectare property might not meet the subdivision threshold โ and may signal other restrictions.
Hazards and Risks
Bushfire-prone land, flood risk, landslip, contamination, acid sulphate soils. If your certificate flags bushfire risk, you’ll need a Bush Fire Attack Level (BAL) assessment. If it flags flooding, you’ll need hydraulic advice. These aren’t automatically deal-breakers โ but they affect your design, your costs, and your approval pathway.
โขย One thing worth knowing: If you’re buying land for a glamping site, a 10.7 certificate must be attached to the contract of sale by law. Check it before you sign โ not after.ย
ย
Section 10.7(2) & (5) โ The Comprehensive Certificate
The combined certificate includes everything in the 10.7(2), plus any additional information the council holds that might affect the land. Councils aren’t required to include this extra layer, but they often do when it’s requested.
This additional information might include:
- Proposed road widening or land acquisitions โ if Transport for NSW has plans that affect your property boundary or access
- Heritage listings or conservation orders โ if the site contains an Indigenous heritage artefact or a heritage-listed structure
- Outstanding orders or notices โ such as a clean-up notice for illegal dumping on the property
For glamping projects, the combined certificate is worth the extra cost. A transmission line easement or a planned highway widening can fundamentally change what’s viable on a site. Better to know before you’ve committed.
Why Glamping Operators Need This First
A planning certificate doesn’t tell you how to design your site or which structures to use. That comes later. What it tells you is whether you’re starting on the right piece of land โ and that determines everything else.
Confirm permitted uses. The certificate tells you whether tourist and visitor accommodation is permitted with consent, permitted without consent, or outright prohibited. If it’s prohibited, your glamping concept is a non-starter on that property regardless of what you build.
Understand development standards. Some zones carry strict controls on floor area, building height, or guest numbers that directly affect your business model. Knowing these before you design your site saves you from having to start over.
Identify hazards early. Bushfire, flooding, and contamination all affect your approval pathway and your design costs. Knowing upfront gives you time to plan and budget accordingly.
Check for draft changes. Certificates include information about draft LEPs and SEPPs that are in progress. That means you get an early warning about rezoning changes that might either open up or close off your plans โ before they take effect.
Enable proper due diligence. If you’re buying land specifically for a glamping business, the certificate is part of your due diligence alongside building inspections and pest reports. Don’t treat it as an afterthought.
How to Order a Section 10.7 Certificate
The process is straightforward.
Step 1 โ Identify the land. Have the property’s legal description (Lot/DP number) or the full address ready.
Step 2 โ Contact the council or use the NSW Planning Portal. Most councils offer online ordering. The NSW Planning Portal also provides an online Section 10.7 service where available, allowing digital lodgement and delivery.
Step 3 โ Choose your certificate type. You can order either the standard 10.7(2) or the combined 10.7(2) & (5). For a glamping site assessment, the combined version is worth the modest additional cost.
Step 4 โ Pay the fee. Typically under $100 for the standard certificate. The combined version is slightly more.
Step 5 โ Receive the certificate. Turnaround varies by council โ some offer near-instant digital download, others take a few days.
You don’t need to own the property to order a certificate. This makes it a useful tool for checking multiple properties before making any offers or commitments.
ย
ย
How to Read the Certificate Without Getting Lost
Planning certificates are written in planning language, which is its own dialect of English. Here’s how to navigate it.
Start with zoning. Look at the zoning description and the list of permissible uses. Find “tourist and visitor accommodation” or “farm stay accommodation.” If it’s not listed as permissible (with or without consent), that’s your signal to dig deeper before proceeding.
Check the planning instruments. Which SEPPs are listed? If the Agritourism SEPP appears, farm stay accommodation pathways may be available. If the Housing SEPP is listed, STRA rules may apply to any residential dwelling on the property.
Look at development controls. Height limits, setbacks, density rules. These define the physical parameters of what you can build and how many structures you can operate.
Review the hazards. Bushfire-prone land means a BAL assessment. Flood-prone land means hydraulic engineering advice. Note these early โ they’re not insurmountable, but they add time and cost to your project.
Read the Section (5) notes carefully. If you’ve ordered the combined certificate, the additional council information is often where the unexpected things live โ heritage overlays, easements, proposed acquisitions. These are the surprises worth paying to avoid.
If you’re finding the language difficult to interpret, that’s normal. Translating planning certificates into plain English is one of the core things the NSW Glamping Planning Pack is built to do.
When to Get an Updated Certificate
Planning controls change. An updated certificate is worth ordering when:
- A draft LEP or SEPP becomes active โ new rules may open up or restrict what’s possible on your land
- More than 12 months have passed since your last certificate
- You’re about to lodge a development application โ councils often require a recent certificate to accompany your DA
- You’re buying or selling the property โ it must accompany the sale contract by law
Staying current with your certificate means you’re making decisions based on the rules that actually apply today, not the ones from two years ago.
Your Next Step
Once you have your Section 10.7 certificate and understand your zoning and restrictions, the next question is which approval pathway applies to your project โ exempt development, complying development, or a full DA.
That’s exactly what the NSW Glamping Planning Pathway helps you work through, from a $27 self-guided property check through to full done-for-you planning support.
(See all four stages and find the one that fits your situation.)
Keep Reading
This is the first in a series of guides walking NSW landowners through the glamping planning process from start to finish. Next up:

Bushfire Basics for NSW Glamping Sites: BAL Ratings, Fire Safety and What Council Actually Expects
30 JUNE 2026 Bushfire Basics for NSW Glamping Sites: BAL Ratings, Fire Safety and What Council Actually Expects Bushfire planning isn’t optional for NSW glamping operators โ it shapes your site layout, your structures, and your approval pathway. Here’s what BAL ratings mean and what every glamping site needs to have in place. By Jesse Anyan Founder of Glamporise TL;DR Most rural NSW properties sit on bushfire-prone land. For glamping operators, that means a Bush Fire Attack Level (BAL) assessment is required as part of your planning and building approvals โ and your BAL rating determines everything from your setbacks

Water, Waste and Toilets: The Unglamorous Systems That Make or Break Your NSW Glamping Site
30 JUNE 2026 Water, Waste and Toilets: The Unglamorous Systems That Make or Break Your NSW Glamping Site No one books a glamping trip for the sewage system. But water, waste, and toilets are the systems that determine whether your NSW glamping site stays open โ or gets shut down. Here’s what you need to know. By Jesse Anyan Founder of Glamporise TL;DR Every NSW glamping site needs three things sorted before guests arrive: safe drinking water, a compliant waste system, and enough water on hand for firefighting. Whether you go traditional (septic, mains connection) or eco-friendly (composting toilets, greywater

The Hidden Permits Most NSW Glamping Operators Miss: Section 68 Approvals Explained
30 JUNE 2026 The Hidden Permits Most NSW Glamping Operators Miss: Section 68 Approvals Explained You’ve got your DA sorted โ but did you know a separate council permit may be required before you install a composting toilet, a moveable dwelling, or a water tank? Here’s what Section 68 covers and why glamping operators keep getting caught out by it. By Jesse Anyan Founder of Glamporise TL;DR Section 68 of the Local Government Act 1993 requires a separate council approval for specific activities โ including installing moveable dwellings, setting up water and waste systems, and operating on-site sewage management. This